A rollout without stopping production

We do not move everything at once. We start with one product and one hall, and new areas join once the previous one works.

Six steps from start to full use

The order follows the setup wizard inside the product.

1️⃣

Pick a pilot product

We take one repeat product and one hall where the effect is easiest to see.

2️⃣

Import the design

We upload STEP files or build the model in CAD, the system creates the BOM, and you approve the make-or-buy decisions.

3️⃣

Describe the plant

Halls, foremen, machines, people and terminals — via the setup wizard, with an industry pack as the starting point.

4️⃣

Run the first pilot order

We take a real order through the whole flow and compare it with how you worked before.

5️⃣

Train the operators

Operators learn on the shop-floor terminal with real tasks, not in a separate training environment.

6️⃣

Scale

We add more products and halls and, when needed, connectors to your ERP.

Questions from manufacturers

Do we have to migrate all data at once?+
No. The pilot covers the chosen product, and data is added in stages.
Can it connect to our ERP?+
Yes. There are ERP connectors, and data can also be exchanged through the API and MCP.

Take your production digital this week

Your 14-day free trial includes engineering BOM, production orders and quality control.